The client had contracted Gulf Sands General Contracting LLC for filling of the water basin for the intake system of the Nuclear Reactors.
The greatest challenge lay in the fact that the pumps were installed on the beach, and their suction pipes had to be drawn 150m into the sea, to remain at least 2-3m below the seawater level during low tide.
Using 2 numbers each of 12” and 18” Cornell pumps, we achieved the required flow of 6500 m3/hr.
The client was extremely satisfied with the job, though mildly surprised by the Suction-Lift capabilities of the pump-sets.