In this project our pumps handled a maximum incoming flow of 3240 m3/hr for a period of 6 month
Gulf Sands General Contracting LLC, installed 2 nos. of duty pumps for the successful over pumping of raw sewage of 3240 m3/hr to a distance of 1 KM. It was achieved without any issue with our 3 x 12” (2 duty and 1 stand by) Redi-prime Engine driven pump.
ADSSC was impressed with the overall setup of the whole pumping system and appreciated our team on the earliest completion of installation process.